Changed Motor Oil & Replaced Filter, Added 5 QTS Standard Motor Oil, Lube Chassis, Check all Fluid Levels
Labor
ENGINE TORQUE MOUNT – Remove & Replace – Engine Moving Control Rod
TIE ROD &/OR END – Remove & Replace – Outer,One Side – [Includes: Adjust toe-in only. NOTE: Deduct .4 if alignment is also performed. NOTE: Manufacturer recommends removal of Rack and Pinion Steering Gear when replacing Inner Tie Rod End(s) on some models
STABILIZER BAR CONTROL LINK – Remove & Replace – Both
Miguel R. gave our service a 5 star review on 2/16/2023
ENGINE ASSEMBLY (COMPLETE) – Remove & Replace – AWD – [Includes: Transfer all necessary parts to GM exchange Engine. Includes: Recover, Evacuate and Recharge Air Conditioning System.] – [Includes: R&I Engine Assembly. Transfer Fuel and Electrical Assembli
Gilbert M. gave our service a 5 star review on 11/10/2022